Portfolio

  • Date: 2008
  • scope: HI-FOG®
  • Location: Abu Dhabi, UAE
  • Service Scope: Turnkey

Sheikh Zayed Tunnel

O One of the Middle East’s longest road tunnels. The tunnel begins on Dalma Street and allows motorists to travel uninterrupted to the Corniche area and Mina Port. The tunnel is 4.2 kilometers, with a 2.4-kilometer enclosed section. The length is 4.2KM and the volume approximately is 550,000 m and 4 lanes each in outbound and inbound directions with a total of 8 lanes. DT has the function of protecting this Tunnel using the HI-FOG® Water Mist system.

What is Challenge for client?

A wonderful serenity has take possion of my entire souing like these sweet mornng spring whch enjoy the with my whole heart I am alone, and feel the charm of existenc.the spot whch was create For then bliss of souls like mineing am so happy my dear frend. so has take possion of my entire souing like these sweet mornng spring whch enjoy the with my whole heart I am alone, and feel the charm of existenc.

Power & Energy Sector

Consectetur adipiscing elit sed do tempor labor dolore magna quis

Petroleum Refinery

Consectetur adipiscing elit sed do tempor labor dolore magna quis

Mechanical Engineering

Consectetur adipiscing elit sed do tempor labor dolore magna quis

Providing solutions from start to the end

A wonderful serenity has take possion of my entire souing like these sweet mornng spring whch enjoy the with my whole heart I am alone, and feel the charm of existenc.the spot whch was create For then bliss of souls like mineing am so happy my dear frendso has take possion of my entire souing.
This site is registered on wpml.org as a development site.