Portfolio

  • Date: 2009
  • scope: HI-FOG®
  • Location: Cairo International Airport, Egypt
  • Service Scope: Turnkey

Operations And Crisis Management Building

TThe international airport of Cairo and the busiest in Egypt and serves as the primary hub for Egypt Air and Egypt Air Express as well as several other airlines . The operation and crisis management room includes four systems as operation systems that follow up the operation of the trip for every airport. DT has the function of protecting this Data Center using the HI-FOG® Water Mist system.

What is Challenge for client?

A wonderful serenity has take possion of my entire souing like these sweet mornng spring whch enjoy the with my whole heart I am alone, and feel the charm of existenc.the spot whch was create For then bliss of souls like mineing am so happy my dear frend. so has take possion of my entire souing like these sweet mornng spring whch enjoy the with my whole heart I am alone, and feel the charm of existenc.

Power & Energy Sector

Consectetur adipiscing elit sed do tempor labor dolore magna quis

Petroleum Refinery

Consectetur adipiscing elit sed do tempor labor dolore magna quis

Mechanical Engineering

Consectetur adipiscing elit sed do tempor labor dolore magna quis

Providing solutions from start to the end

A wonderful serenity has take possion of my entire souing like these sweet mornng spring whch enjoy the with my whole heart I am alone, and feel the charm of existenc.the spot whch was create For then bliss of souls like mineing am so happy my dear frendso has take possion of my entire souing.
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.